Building Trades at Potter CTE
Page Navigation
- Welcome to Building Trades
- Interested students in the Building Trades program
- Interested in Purchasing the HOUSE?
- Architect Print of Floor Plan
- Artist's Concept of Finished House
- Some Information About Our House
-
Modular House 12-13
- Building Trades II Students
- House 12-13 Is All About.......
- Pier Construction 12-13
- Floor Joist System 12-13
- Subfloor 12-13
- Wall Construction 12-13
- Ceiling Joists 12-13
- Knee Walls 12-13
- Rafters 12-13
- Roof System 12-13
- Doors and Windows 12-13
- Plumbing 12-13
- Electrical 12-13
- Rough Interior Misc 12-13
- Exterior Trim 12-13
- Drywall Work 12-13
- Sprayed-in Insulation 12-13
- Cabinetry 12-13
- Flooring 12-13
- Bathrooms 12-13
- Trim Work 12-13
- Field Trips 12-13
-
Modular House 11-12
- Completed House Pictures 11-12
- Pier Construction 11- 12
- Floor Joists 11-12
- Sub Floor 11-12
- Wall Construction 11-12
- Wall Construction 11-12
- Ceiling Joists 11-12
- Rafters, Plywood 11-12
- Installing Shingles 11-12
- Window Install 11-12
- House Rough Interior 11-12
- Plumbing 11-12
- Electrical Install 11-12
- Chair 11-12
- Siding 11-12
- Bathroom Tile 11-12
- Interior Finishes 11-12
- Guest Speaker 11-12
- Giving Garden 11-12
- Building Trades I "Projects" 11-12
-
Modular House 10-11
- Completed House Pics 10-11
- Pier Construction 10 -11
- Floor Framing 10-11
- Wall Framing 10-11
- Exterior Wall Details 10-11
- Roofing 10-11
- Interior Wall Details 10-11
- Window & Door Install 10-11
- Electrical 10-11
- Plumbing 10-11
- Painting 10-11
- Master Bathroom 10-11
- Bedrooms Flooring 10-11
- Kitchen Cabinets 10-11
- Drywall 10-11
- Trim & Doors 10-11
- Vinyl Siding 10-11
- Modular House 09-10
-
Modular House 08-09
- Pier Construction 08-09
- Floor Framing 08-09
- Wall Construction 08-09
- Interior Wall Framing 08-09
- Knee Wall 08-09
- Temporary Entrance 08-09
- Ceiling Joists & Rafters 08-09
- Foam Insulation 08-09
- Roofing 08-09
- Exterior Framing 08-09
- Plumbing & Electrical 08-09
- Drywall 08-09
- Joint Compound 08-09
- Windows & Doors 08-09
- Interior Trim 08-09
- Bathroom 08-09
- Kitchen Cabinets 08-09
- Exterior House Pictures 08-09
- The Western New York Teacher Center
- Field Trips 12-13
-
On October 3, students from Mr. Grieco’s and Mr. Daluisio’s Building Trades II class went on a
“real world” field trip sponsored by the WNY Building Trades Council. The field trip was held at the Operating Engineers Training Facility in Lakeview NY.
The students spent the day being exposed to most of the building trades unions that operate in WNY and NY State as a whole. They were given the opportunity to participate in the operation of heavy equipment and to view and to experience first hand, most of the trades. They were given information on apprenticeship and journeyman programs.
In addition to lunch, the students were given hard hats, safety glasses and “goodie bags” with lots of information regarding apprenticeships and journeyman programs offered by the trades. The students experienced first hand, what a day in the life of a building trades worker can be like.
More than a few students during the day were overheard saying “what a great opportunity it was” and “it’s amazing how much money you could make doing something that you really like.” This was the eighth time that the students have attended this function.