• After the roof framing is complete, including installation of lookouts , barge rafter, and fascia, the students install roof sheathing and roof covering,which includes ice and water shield, 30# felt, aluminum rake and drip edge, 25 yr.  asphalt shingles.
Last Modified on January 10, 2010